CDM – Documentation | What documents are required? | Who’s responsible?

  • SHARE

CDM – Documentation | What documents are required? | Who’s responsible?

health and safety

10 Minute read, Published: January 23, 2025

  • SHARE

YouTube video

Video Overview:

James MacPherson from Rebranding Safety unpacks the complex world of CDM (Construction Design and Management) documentation, breaking down the essential paperwork required for compliance and explaining the responsibilities of clients, principal designers, contractors, and other stakeholders.

James covers key documents, such as Pre-Construction Information (PCI), F10 Notifications, Construction Phase Plans (CPP), Risk Assessments and Method Statements (RAMS), and the Health and Safety File, offering practical insights into their purpose and legal importance. He also emphasises the need for proportionality in documentation, the pitfalls of redundant processes, and the importance of fostering collaboration between all parties involved in a project.

CDM Documentation: What Documents Are Required and Who’s Responsible?

CDM (Construction Design and Management) paperwork can seem daunting. Nevertheless,  understanding the essentials can ensure smooth operations and compliance. This article outlines the essential CDM documents, who is responsible for them, and tips for managing them effectively.

Introduction

CDM regulations are designed to improve health, safety, and welfare standards in construction projects. However, the paperwork associated with these regulations often feels overwhelming. Here’s a breakdown of the essential CDM documents, their purpose, and who is responsible for them.

1. Pre-Construction Information (PCI)

The pre-construction information is fundamental to CDM compliance.

What is PCI?

  • It includes essential details about the site, such as:
    • Underground and overhead services
    • Asbestos surveys
    • Environmental hazards
    • Site-specific risks
  • The goal is to provide contractors and designers with all the necessary information to plan safely.

Who’s Responsible?

  • Client: Legally required to provide this information.
  • Often, the Principal Designer steps in to assist clients, especially if the client lacks expertise.

Why It’s Important

  • PCI ensures that all risks are considered before construction begins.
  • It’s a legal requirement, and failing to provide it can result in serious consequences.

2. F10 Notification

The F10 form is required for notifiable projects.

What is a Notifiable Project?

A project is notifiable if:

  • It lasts more than 30 working days and involves 20 or more workers simultaneously.
  • It exceeds 500 person-days of work.

Who’s Responsible?

  • The client must notify the HSE (Health and Safety Executive).
  • For domestic projects, the responsibility can fall to the Principal Designer or Principal Contractor, with a written agreement.

Key Takeaway

The F10 notification alerts the HSE about larger projects that warrant closer oversight.

3. Construction Phase Plan (CPP)

A crucial document for managing health and safety during the construction phase.

What is a CPP?

  • It outlines:
    • Risk management strategies
    • Welfare provisions
    • Emergency plans
  • Essentially, it’s the health and safety management system for the project.

Who’s Responsible?

  • The Principal Contractor must create and maintain the CPP.

Common Mistakes

  • Neglecting to update the CPP during the project.
  • Overlooking key elements like site risk assessments, emergency access, and welfare provisions.

4. Risk Assessments and Method Statements (RAMS)

Often considered the most critical and mismanaged documents in construction projects.

What are RAMS?

  • Risk Assessments: Identify potential hazards and outline control measures.
  • Method Statements: Describe how tasks will be carried out safely.

Who’s Responsible?

  • Individual Contractors: Each trade (e.g., electricians, roofers) must provide their own RAMS.
  • The Principal Contractor ensures that all contractors submit and follow their RAMS.

Challenges

  • Balancing specificity and practicality.
  • Avoiding repetitive or generic templates.

5. Health and Safety File

A comprehensive record was handed over to the client at the end of the project.

What Does It Include?

  • As-built drawings
  • Maintenance and cleaning instructions
  • Fire strategy documents

Who’s Responsible?

  • Prepared by the Principal Designer during the pre-construction phase.
  • If the Principal Designer’s role ends before project completion, the duty shifts to the Principal Contractor.

Why It’s Important

The health and safety file is critical for the building’s future safety management.

 

Top Tips for CDM Documentation

1. Proportionality Matters

 

Tailor the depth and complexity of the paperwork to the risk and complexity of the project. Overburdening small contractors with unnecessary documentation only discourages safety compliance.

2. Streamline Contractor Pre-Qualifications

 

Avoid redundant processes like multiple pre-qualification questionnaires (PQQs). Using schemes like SSIP (e.g., CHAS, SafeContractor) effectively can simplify approvals.

3. Focus on Safety, Not Paperwork

 

Ensure that the processes genuinely enhance safety rather than just ticking boxes.

4. Keep It Collaborative

 

Foster teamwork between clients, designers, and contractors. CDM compliance works best when all parties work together.

5. Don’t Overwhelm Contractors

 

Subcontractors often face unnecessary hurdles. Simplify processes to encourage their engagement in safety initiatives.

Conclusion

CDM documentation is essential for safe and efficient construction projects. By understanding the purpose and responsibilities of each document, teams can streamline their processes and maintain compliance.

For further assistance with CDM paperwork or construction risk management, visit Wristblue Ltd or email James at james@wristblue.com.

 

 

Ready to talk?

Let’s get together on a call to see where we can support you and add value to your business with structured health & safety consulting.

Let’s talk

For a quote, complete the form below and arrange a discovery call where we can chat though your requirements.

Quote
GDPR Notice